Click on links below for specific instructions:

+ Wall Cabinets (Shown on right)

+ Base Cabinets

+ Worktops

+ Modular Walls

+ Transaction Tops

1) Remove the top front panels on the modular walls that will support the transaction tops. Pry one side of the panel away from the keku clips using a 5-in-1 tool and pop the panels off.

2) Place the transaction tops on the modular walls in the correct locations, aligning worktop seams where they meet.

3) Center an angle bracket under the transaction top seams by screwing it into the modular wall below the
wall's top panel (use a 5/8" panhead self-tapping wood screw).

4) If needed, a 50 x 50 mm flat bracket may also be used underneath, on either side of the modular wall, to bridge the transaction top seams.

5) Once angle brackets have been secured under the worktop seams, screw an angle bracket into each modular wall below the wall's top panel (using a 5/8" panhead self-tapping wood screw). Locate these angle brackets on one end of the wall closest to an end panel; these are to add rigidity to the transaction top.

6) Check alignment and consistent overhang of the transaction tops over the modular walls below (centered or offset), and adjust accordingly.

7) Attach the worktops to the modular walls by screwing up through the holes in the angle brackets, through the modular wall top panels, and into the transaction tops. Use a #8 flathead Phillips wood screw.

8) Snap the modular wall cover panels back on using the keku clips.

topbutton

 

why neocase | sustainability | client stories | technical information | contracts | contact | literature
home | sitemap | healthcare | commercial | laboratory | specialty products

 
Neocase | PO Box 5658 Winston Salem, NC 27113-5658 | ph: 336.778.2098 | fax: 336.778.9102 | email: kathy@neocase.net
Copyright © 2004 Modern Industrial Design, Ltd. All rights reserved.
| Privacy Policy